Originally posted by I Man Rastafari
View Post

..the bridge was replaced in 1950 by the current bridge. The third bridge, completed in 2007, spans the Tacoma Narrows parallel to and south of it.
The SR16 corridor (which the bridge is on) is used by 85,000 to 90,000 vehicles per day and this figure is expected to rise to 120,000 vehicles per day by 2020
Leave a comment: